Grenfell Tower
The inquiry examined the rapid external spread, the refurbishment and product testing, the regulatory system, and the emergency response. Its Phase 2 report was published in September 2024.
Final public inquiry publishedBCAM FIRE WATCH / LANDMARK ARCHIVE
Follow major investigations from the incident through published findings and the status of policy or practice responses. Each case links back to its primary records.
Trace the evidence and the response. Final findings, recommendations, enacted rules and announced actions are different stages.
Explore all sourced fires on the globe →The inquiry examined the rapid external spread, the refurbishment and product testing, the regulatory system, and the emergency response. Its Phase 2 report was published in September 2024.
Final public inquiry publishedA major fire affected Wang Fuk Court during external repair work. Hong Kong published the independent committee’s report on 29 October 2026 and announced a programme of reforms. Criminal prosecutions are separate proceedings.
Independent committee report published 29 October 2026A construction-stage roof fire spread through layers and openings while the convention centre was being built. Fire and Emergency New Zealand published an investigation into origin, cause and spread.
Fire investigation report publishedFire spread rapidly up the façade of a Melbourne apartment building. The fire analysis and subsequent Victorian audit exposed the need to identify the actual cladding system and its compliance evidence across existing buildings.
Fire analysis and cladding audit publishedThe Lakanal House fire and 2013 inquest raised questions about refurbishment, compartmentation, fire risk assessment and high-rise response. The coroner’s recommendations and the organisations’ responses are distinct records.
Coroner’s inquest concluded; responses publishedPyrotechnics ignited polyurethane foam lining the platform area. NIST investigated rapid fire spread, missing sprinklers, crowd movement and the time available to escape, then tracked changes to model codes and state practice.
NIST final investigation and response tracker publishedA fire that originated on an apartment balcony trapped two residents. The NSW coroner examined missing sprinklers, post-occupation alterations, fire safety statements and unresolved orders. The coroner could not determine the ignition cause on the balance of probabilities.
Coronial findings and recommendations publishedA fatal industrial-building fire led SCDF to investigate external composite cladding and verify other buildings that might have used similar panels. Singapore subsequently tightened controls over the fire safety product supply chain.
SCDF findings, audit and enacted response publishedA transformer fire in a ground-floor parking area sent smoke through stairways and air-conditioning ducts into a cinema. The Supreme Court judgment documents blocked exits, failed emergency provisions and failures in licensing and inspection.
Supreme Court judgment published