Asset
Identify the system, location and responsible parties.
BCAM / WHOLE-BUILDING INTELLIGENCE
BCAM is designed to keep assets, obligations, maintenance work, inspection findings and close-out decisions together across a whole building. The aim is a record that shows what happened, who was responsible and what remains open.
BCAM / ONE BUILDING RECORD
Consider a changed cable route beside a smoke damper. The diagram shows the relationship between trade evidence and accountable closure; it is a fictional example, not a compliance finding.
THE PRACTICAL PROBLEM
Building owners and contractors need to know which asset was checked, what obligation applied, who found an issue, what action followed and whether the evidence supports closure. Those facts often sit in separate reports, inboxes and registers.
BCAM’s product direction is to keep that chain together while preserving trade expertise and accountable human decisions.
Identify the system, location and responsible parties.
Connect the relevant requirement and jurisdiction to the work.
Record what was inspected, found and left unresolved.
Track a defect, repair, review and closure back to the asset.
ILLUSTRATIVE HIGH-RISE WORKFLOW
This fictional example shows how BCAM is intended to preserve an audit trail across fire, electrical and mechanical work. It is not a customer record, inspection procedure or compliance determination.
Where AI is used, it can help assemble the record and flag missing evidence for review. It does not sign off the work or turn an unresolved finding into a pass.
Explore an example building recordAn inspector photographs a new cable penetration in a high-rise riser and records its location against the compartment drawing.
Finding open. The photo alone does not establish fire resistance.
The building team assigns the finding to the responsible contractor and records the approved detail and evidence the reviewer needs.
The owner, due date and affected barrier stay visible.
The contractor records the installed system and attaches dated evidence. The electrical work order and any affected mechanical interface stay linked to the same location.
Work reported complete. Verification is still pending.
An authorised reviewer checks the installation evidence and reinspection record against the approved detail, then records the decision and its basis.
Close only when evidence supports it. Keep the original finding and the full decision history.
ONE BUILDING / MULTIPLE DISCIPLINES
Detection, suppression, passive fire, smoke control and the evidence of inspection and rectification.
Explore fire knowledge ↗Mechanical assets, planned maintenance, controls, performance and interfaces with fire systems.
Explore HVAC ↗Power, lighting, controls and the evidence that connects an electrical finding to affected building systems.
Explore Electrical ↗Lifts, plumbing and security are further trade contexts. Applicable duties and test procedures depend on the jurisdiction and system.
CURRENT STATUS
Building records, field workflows and Ask Sam are not connected in this preview. BCAM can help organise evidence and follow-up; competent people remain responsible for testing, assessment and compliance decisions.
How the BCAM system fits together